Building refurbishment in Alicante
We carry out building refurbishment in Alicante and on the Costa Blanca for those who own the entire property: owners, investors and family offices. Survey, design, licence and works under a single contract, until we hand the renovated building over to you with its documentation.
We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00
Complete projects only: we do not do partial renovations or one-off jobs.

Everything it takes, under a single contract
Structure and foundations
Strengthening of floor slabs, columns and foundations when the survey calls for it.
Façades
Repair of the substrate, insulation and new cladding, with scaffolding and protection for the street.
Roofs
Waterproofing, insulation and renewal of flat and pitched roofs.
Main building services
Electrics, water, drainage and telecoms for the whole building, new and accessible for maintenance.
Accessibility and lift
A new or enlarged lift, ramps and step-free routes to every floor.
Energy efficiency
Envelope, windows and equipment that lower consumption and improve the energy rating.
Common areas and flats
Entrance hall, staircases and, if you need it, every flat finished and ready to move into.
What a full refurbishment includes

A full refurbishment treats the building as a whole. The structure is inspected, the envelope is renewed, the main services are replaced and accessibility is resolved. Then, if you need it, the flats and the common areas are finished.
The exact scope is not decided on the first visit. It is set by the survey: exploratory openings, a structural inspection and the real condition of the services. With that document you know what has to be done, what is worth doing and what can wait.
That order matters. If the façade is renewed before the downpipes are replaced, or the entrance hall is painted before the lift goes in, you pay for the work twice. Managing the whole building as one project avoids that kind of mistake and leaves you with one schedule and one budget.
When refurbishment makes sense

- The building is more than 50 years old. In the Comunitat Valenciana, Decree 53/2018 of the Consell (Decreto 53/2018) requires residential buildings of that age to have a Building Evaluation Report (Informe de Evaluación del Edificio, IEE), which is valid for 10 years. It is often the first warning of what the property needs.
- The sea air has done its work. On the coast, salt and humidity corrode steel reinforcement, loosen cladding and degrade windows and doors sooner than they do inland.
- You have just bought the building, or you are about to. This is the moment to find out what work it needs, before you settle its value and its use.
- You are going to let it. A building renovated in one go costs less to maintain than one repaired floor by floor.
How we work
- Survey. A visit, exploratory openings and an inspection of the structure, façade, roof and services. You end up with a report on the condition of the building and the scope of the works.
- Design and licence. Registered architects (arquitectos colegiados) draw up the design and we apply for the licence at the town hall. The construction design (proyecto de ejecución) includes measurements and an itemised budget.
- Works in phases. We sequence the works so that one phase does not get in the way of the next: structure and envelope first, then services, and finishes last.
- Handover with documentation. The building is handed over finished, with as-built drawings and the certificates for the installations.
With tenants or with the building empty

If the building is empty, the works move forward one whole floor at a time and are faster and cleaner.
If it has tenants, the work on the façade, roof, main services and common areas is organised in phases, with protected access routes and advance notice to residents. Inside the flats we only work when they are vacant: that is how we do it on all our projects.
With tenants, the works are also planned with the outside world in mind: set hours for noisy work, water or power cuts announced in advance, and a named person residents can turn to. What tenants go through during the works ends up shaping your relationship with them.
What you have at the end

- A building with its structure inspected, a new envelope and renewed main services.
- The final drawings of the works and the certificates for the installations.
- A single point of contact throughout the works, and a weekly report with photos, schedule and progress certificates (certificaciones).
- The guarantees set by the Building Act (Ley 38/1999 de Ordenación de la Edificación, LOE).
The works are carried out in line with the Technical Building Code (Código Técnico de la Edificación, CTE) in every area it covers: structural safety, fire safety, accessibility, health and hygiene, noise and energy saving.
Other projects we deliver complete
Rental buildings
Refurbishment and new build of buildings for letting.
Hotels
New build, extension and full refurbishment of city and holiday hotels.
Change of use
From shop or office to home, and from building to hotel or aparthotel.
Full renovations
Complete flats and houses, with a design and a contract. Complete projects only.
One responsible party, three stages
Works insured for €1,200,000 · 2-year guarantee from handover · Contract and itemised quote
Before you invest, understand the build.

Turnkey fixed-price contract in Spain: what to include
What a fixed price really means on a building project, what the Spanish Civil Code says and which clauses a turnkey contract needs to protect you.
Read
Hotel feasibility study in Spain: what it analyses
What a feasibility study checks before you buy a building or a plot for a hotel: planning, tourism rules, technical issues, investment and timing.
Read
Hotel construction phases in Spain: licence to opening
The seven phases of a hotel project, from feasibility to opening: what is decided in each, what the developer receives and where time is lost.
ReadWhat to know before you start
Do I need a major building licence (licencia de obra mayor)?
It depends on the scope, but a refurbishment that affects the structure, the façade or the layout usually needs a technical design and a major building licence. We draw up the design with registered professionals and apply for the licence before work starts.
What is the Building Evaluation Report?
It is the report that Decree 53/2018 of the Consell requires for residential buildings more than 50 years old in the Comunitat Valenciana. It is valid for 10 years. If your building already has one, we use it as the starting point for the survey.
Can the works be done with tenants in the building?
Yes, on the façade, roof, main services and common areas, organised in phases. Inside the flats we only work when they are vacant.
Are there public grants for refurbishment?
Yes. The State Housing Plan (Plan Estatal de Vivienda 2026–2030) includes a line of grants for refurbishment. The conditions depend on each call for applications; during the survey we tell you whether it is worth looking into for your building.
Refurbish, or demolish and build anew?
It depends on the condition of the structure, on what the zoning plan (planeamiento) allows and on any protection the building has. We assess it in the survey, with both options on the table.
What guarantees come with the works?
Those set by the Building Act (Ley 38/1999 de Ordenación de la Edificación, LOE): 1 year for defects in finishes, 3 years for defects affecting habitability and 10 years for defects affecting the structure. When the works are handed over, you receive written documentation of everything that has been built.

Tell us about your project by phone
In one call we tell you whether we can take on your project, what is needed to start and what the next steps are. Complete projects only: we do not do partial renovations or one-off jobs.