+34 602 510 710

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

dmitriy.l@teciforp.es
Building refurbishment

Building refurbishment in Alicante

We carry out building refurbishment in Alicante and on the Costa Blanca for those who own the entire property: owners, investors and family offices. Survey, design, licence and works under a single contract, until we hand the renovated building over to you with its documentation.

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

Complete projects only: we do not do partial renovations or one-off jobs.

Early 20th-century residential building with its façade covered in scaffolding during refurbishment
What's included

Everything it takes, under a single contract

Structure and foundations

Strengthening of floor slabs, columns and foundations when the survey calls for it.

Façades

Repair of the substrate, insulation and new cladding, with scaffolding and protection for the street.

Roofs

Waterproofing, insulation and renewal of flat and pitched roofs.

Main building services

Electrics, water, drainage and telecoms for the whole building, new and accessible for maintenance.

Accessibility and lift

A new or enlarged lift, ramps and step-free routes to every floor.

Energy efficiency

Envelope, windows and equipment that lower consumption and improve the energy rating.

Common areas and flats

Entrance hall, staircases and, if you need it, every flat finished and ready to move into.

What a full refurbishment includes

Early twentieth-century corner building with a restored facade, cornice and wrought-iron balconies

A full refurbishment treats the building as a whole. The structure is inspected, the envelope is renewed, the main services are replaced and accessibility is resolved. Then, if you need it, the flats and the common areas are finished.

The exact scope is not decided on the first visit. It is set by the survey: exploratory openings, a structural inspection and the real condition of the services. With that document you know what has to be done, what is worth doing and what can wait.

That order matters. If the façade is renewed before the downpipes are replaced, or the entrance hall is painted before the lift goes in, you pay for the work twice. Managing the whole building as one project avoids that kind of mistake and leaves you with one schedule and one budget.

When refurbishment makes sense

Weathered facade of an old seafront building with cracked plaster and damaged balconies
  • The building is more than 50 years old. In the Comunitat Valenciana, Decree 53/2018 of the Consell (Decreto 53/2018) requires residential buildings of that age to have a Building Evaluation Report (Informe de Evaluación del Edificio, IEE), which is valid for 10 years. It is often the first warning of what the property needs.
  • The sea air has done its work. On the coast, salt and humidity corrode steel reinforcement, loosen cladding and degrade windows and doors sooner than they do inland.
  • You have just bought the building, or you are about to. This is the moment to find out what work it needs, before you settle its value and its use.
  • You are going to let it. A building renovated in one go costs less to maintain than one repaired floor by floor.

How we work

  1. Survey. A visit, exploratory openings and an inspection of the structure, façade, roof and services. You end up with a report on the condition of the building and the scope of the works.
  2. Design and licence. Registered architects (arquitectos colegiados) draw up the design and we apply for the licence at the town hall. The construction design (proyecto de ejecución) includes measurements and an itemised budget.
  3. Works in phases. We sequence the works so that one phase does not get in the way of the next: structure and envelope first, then services, and finishes last.
  4. Handover with documentation. The building is handed over finished, with as-built drawings and the certificates for the installations.

With tenants or with the building empty

Covered pedestrian walkway under scaffolding with a timber roof beside an open building entrance

If the building is empty, the works move forward one whole floor at a time and are faster and cleaner.

If it has tenants, the work on the façade, roof, main services and common areas is organised in phases, with protected access routes and advance notice to residents. Inside the flats we only work when they are vacant: that is how we do it on all our projects.

With tenants, the works are also planned with the outside world in mind: set hours for noisy work, water or power cuts announced in advance, and a named person residents can turn to. What tenants go through during the works ends up shaping your relationship with them.

What you have at the end

Renovated building lobby with a stone staircase, glazed lift and terrazzo floor
  • A building with its structure inspected, a new envelope and renewed main services.
  • The final drawings of the works and the certificates for the installations.
  • A single point of contact throughout the works, and a weekly report with photos, schedule and progress certificates (certificaciones).
  • The guarantees set by the Building Act (Ley 38/1999 de Ordenación de la Edificación, LOE).

The works are carried out in line with the Technical Building Code (Código Técnico de la Edificación, CTE) in every area it covers: structural safety, fire safety, accessibility, health and hygiene, noise and energy saving.

+190Full renovations
8Years in the sector
80+Professionals
+200Satisfied clients

Works insured for €1,200,000 · 2-year guarantee from handover · Contract and itemised quote

Frequently asked questions

What to know before you start

Do I need a major building licence (licencia de obra mayor)?

It depends on the scope, but a refurbishment that affects the structure, the façade or the layout usually needs a technical design and a major building licence. We draw up the design with registered professionals and apply for the licence before work starts.

What is the Building Evaluation Report?

It is the report that Decree 53/2018 of the Consell requires for residential buildings more than 50 years old in the Comunitat Valenciana. It is valid for 10 years. If your building already has one, we use it as the starting point for the survey.

Can the works be done with tenants in the building?

Yes, on the façade, roof, main services and common areas, organised in phases. Inside the flats we only work when they are vacant.

Are there public grants for refurbishment?

Yes. The State Housing Plan (Plan Estatal de Vivienda 2026–2030) includes a line of grants for refurbishment. The conditions depend on each call for applications; during the survey we tell you whether it is worth looking into for your building.

Refurbish, or demolish and build anew?

It depends on the condition of the structure, on what the zoning plan (planeamiento) allows and on any protection the building has. We assess it in the survey, with both options on the table.

What guarantees come with the works?

Those set by the Building Act (Ley 38/1999 de Ordenación de la Edificación, LOE): 1 year for defects in finishes, 3 years for defects affecting habitability and 10 years for defects affecting the structure. When the works are handed over, you receive written documentation of everything that has been built.

Call us

Tell us about your project by phone

In one call we tell you whether we can take on your project, what is needed to start and what the next steps are. Complete projects only: we do not do partial renovations or one-off jobs.

+34 602 510 710

WhatsApp

We speak English, Spanish and Russian

Monday to Friday, 9:00–14:00 and 17:00–19:00

We'll call you

Leave your number and we'll call you

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

Data controller: Teciforp S.L. · Purpose: to call you back about your request · Your rights: dmitriy.l@teciforp.es

CallWhatsAppWe'll call you