Build a villa in La Nucía
Teciforp builds new villas and fully renovates chalets in La Nucía, on the urbanisations and in the old village. We work from our only office, in Alicante, and travel to the site: we check the plot, draw up the design, obtain the permit and build, with one company responsible throughout.
We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00
We work in La Nucía from our office in Alicante (C/ Arquitecto Vidal, 22) and travel to the site.

A town of detached houses — and of owners who live abroad
La Nucía's own planning rules single out the detached house as a building type of its own "because of its great development in the municipality". The town had 19,121 residents on 1 January 2025 according to Spain's statistics office (INE), and in 2022 31.2% were foreign nationals — British, German, Romanian and Russian among others. Many owners spend part of the year elsewhere and want one firm to run the whole project.
So the typical job here is a house, not a hotel:
- A new villa on an urbanisation plot or in the plan's detached-house zone — new-build villas.
- A full renovation of a 1980s or 1990s chalet: services, windows, roof, terraces and pool — full renovation.
- Extending an existing house, which is no longer a renovation but permit work, capped by the floor area allowed in its zone.
- Shops at street level in the old village and its extension — commercial fit-out — and units on industrial land — industrial buildings.
If you are still choosing a plot or a house, we will check it before you buy: building and plot search.
What the plan allows on a villa plot
Information as of 16 November 2026, from the texts published in the provincial gazette (BOP) and on the town's e-office; check them before you design.
La Nucía still works with its 1988 General Plan (Plan General de Ordenación Urbana, PGOU), approved by the regional planning commission on 27 July 1988 and published in the BOP on 10 November that year. The town hall has started revising the plan, but in July 2026 the 1988 plan, with its amendments (2007, 2014 and 2018 among others), was still in force.
In the detached-house zone (codes U/U and U/UE), Article 53 as worded in 2014 sets:
- A minimum plot of 1,000 m² with at least 15 m of frontage to a public road.
- A floor area ratio (edificabilidad) of 0.25 m² of building per m² of net plot, and maximum plot coverage of 25% (pools, pergolas and barbecues do not count).
- Setbacks of 5 m from the front and the boundaries; 21 m from the centre line if the plot faces a main road of the plan.
- Two storeys including the ground floor, measured at every point where the house meets the ground; stepped houses up to three levels and 7 m. Basements are allowed.
- At least 50% of the roof in natural-coloured curved clay tiles; solid boundary walls up to 1.20 m, up to 2.20 m with see-through elements or planting.
Note: on urbanisations with their own partial plan (plan parcial), that plan's bylaws apply, and new residential sectors start from 600 m² plots and 0.35 m²/m². The first step is to find out which zone your plot is in.
Building on a slope: retaining walls, terraces and La Serreta stone
Much of the municipality is hillside, and the rules deal with it in detail. Terraces next to a boundary may not sit more than 2 m below the natural ground level at that boundary, interior retaining walls may not show more than 2.50 m, and earthworks must always be finished with La Serreta-type stone walls. Height is measured from the ground at every point of the façade, and a sloping plot never gets more floor area than a flat one would. On top of that, 20% of the plot must be garden, with nothing built above or below it.
The old village (U/CA) has different rules: 80 m² minimum plots, up to three storeys and 10 m, 80% of the roof in curved tiles, wooden or wood-effect aluminium joinery, a La Serreta stone plinth and no air-conditioning units visible from the street. On rural land, nothing may be built within 30 m of either side of a ravine's centre line.
Permits, construction tax and working hours
Permit or self-declaration. Under the town's 2016 bylaw (BOP 29/01/2016), a renovation that adds no floor area and no new building goes through a self-declaration (declaración responsable); a new villa, an extension, demolition, walls and earthworks and a change of use need a permit (licencia). The regional planning law in force (TRLOTUP, 2021) also allows some structural works, demolition and changes of use to go by self-declaration backed by a certificate from an approved inspection body or a professional association. The law gives the town hall two months to decide on a major works permit, three if the building is listed. Everything is filed on the e-office (lanucia.sedelectronica.es).
Tax and fee. The construction tax (ICIO) is 4% with no reliefs, and the permit or self-declaration fee is 2.5% of the construction budget, minimum €30 (tax bylaws published in the BOP on 24/01/2024): 6.5% of the construction budget in municipal charges altogether. Both are self-assessed when you apply; for the ICIO the town uses reference rates — in 2024, €652.17 to €978.25 per m² for a detached house depending on quality, and €417.45 per m² of water surface for a pool.
Working hours. We found no local noise bylaw, so the Valencian Law 7/2002 applies: no noisy work between 22:00 and 08:00 and, in built-up areas, no machine louder than 90 dB(A) at five metres. And if you plan to let the house to holidaymakers, since Decree-Law 9/2024 you need a favourable municipal planning compatibility report.
What we build and renovate in La Nucía
Villas and new build
Villas, detached houses and small apartment buildings.
Full renovations
Complete flats and houses, with a design and a contract. Complete projects only.
Restaurants, shops and offices
Restaurants, shops, offices and clinics, with their activity licence.
Industrial buildings
New build, refurbishment and extension without halting operations.
What to know before you start
Do you work in La Nucía if your office is in Alicante?
Yes. La Nucía and the Marina Baixa are one of the two areas where we work regularly. The office is in Alicante and the team travels to the site for visits and to run the works.
What is the minimum plot for a villa in La Nucía?
In the plan's detached-house zone (U/U and U/UE): 1,000 m² with 15 m of frontage, a floor area ratio of 0.25 m²/m² and 25% coverage. On an urbanisation with its own partial plan, that plan's bylaws apply, so the specific plot has to be checked.
How much does the town hall charge for a building permit?
The 4% construction tax (ICIO) plus a 2.5% fee on the construction budget, minimum €30 — 6.5% in total, under the tax bylaws published on 24/01/2024. Information as of 16/11/2026; not tax advice.
Can I extend my chalet?
Only up to the floor area allowed in its zone (0.25 m²/m² in U/U, or whatever its partial plan sets) and with a permit, because an extension cannot go by self-declaration. We work out how much is left before designing.
I live outside Spain. Can you run the whole project?
Yes: design, permit, construction and regular reports with photos in our project management software. We speak English, Spanish and Russian.
Sources
- Acuerdo de la Comisión Territorial de Urbanismo de 27/07/1988: aprobación del Plan General de La Nucía (Registro autonómico de planeamiento, GVA)
- BOP de Alicante nº 258, 10/11/1988: aprobación definitiva del PGOU de La Nucía
- BOP de Alicante nº 149, 10/08/2026: acuerdo de la CTU de 17/07/2026 sobre la Modificación Puntual UE-4 (vigencia del plan de 1988 y revisión en curso)
- Normas Urbanísticas del PGOU de La Nucía, ejemplar diligenciado (Registro autonómico de planeamiento, GVA)
- BOP de Alicante nº 112, 05/06/2007: modificaciones y aclaraciones de las Normas Urbanísticas (zonas, casco antiguo, barrancos)
- BOP de Alicante nº 195, 13/10/2014: modificación de los artículos 19, 20 y 53 del Plan General (zona de vivienda unifamiliar)
- BOP de Alicante nº 198, 17/10/2018: modificación de artículos del Plan General (alturas, pendientes, sótanos, usos)
- BOP de Alicante nº 19, 29/01/2016: Ordenanza Municipal Reguladora de declaraciones responsables y licencias urbanísticas
- Decreto Legislativo 1/2021 del Consell, texto refundido de la Ley de ordenación del territorio, urbanismo y paisaje (TRLOTUP), arts. 232, 233, 240 y 241
- Sede electrónica de La Nucía: licencia de edificación, demolición, habilitación y cambio de uso (LN-00039)
- BOP de Alicante nº 17, 24/01/2024: Ordenanza Fiscal reguladora del Impuesto sobre Construcciones, Instalaciones y Obras
- BOP de Alicante nº 17, 24/01/2024: Ordenanza Fiscal de la tasa por licencias urbanísticas y comprobación de declaraciones responsables
- Ley 7/2002, de 3 de diciembre, de la Generalitat, de protección contra la contaminación acústica, arts. 42 y 43
- Decreto Ley 9/2024, de 2 de agosto, del Consell, sobre viviendas de uso turístico (DOGV nº 9910, 07/08/2024)
- INE: cifras oficiales de población por municipios (tabla 2856)
- INE: población por municipios y nacionalidad (tabla 33588)
Where we work
We work across the province of Alicante: Alicante and its surroundings, Benidorm and the Marina Baixa, and the rest of the province. Our office is in Alicante and we travel to the site.
Tell us about your project by phone
In one call we tell you whether we can take on your project, what is needed to start and what the next steps are. Complete projects only: we do not do partial renovations or one-off jobs.