Construction company in Benidorm: hotels, buildings and villas
Teciforp renovates hotels, refurbishes whole buildings and builds villas in Benidorm. We work from our only office, in Alicante, and travel to the site — feasibility, design, permits and construction with one company responsible from start to finish.
We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00
We work in Benidorm from our office in Alicante (C/ Arquitecto Vidal, 22) and travel to the site.

What gets built and renovated in Benidorm
Benidorm is a hotel town first and foremost. The council's Urban Agenda, using 2024 figures from the regional tourism board (Turisme Comunitat Valenciana), counts 140 hotels with 44,355 beds — 58 of them four-star and 51 three-star — plus 9,217 holiday apartments. Spain's national statistics office (INE) recorded 48,129 hotel beds open in July 2025 and still 37,727 in December: the town trades all year, which shapes when and how a building can be renovated.
The same document notes that most of the town was built between 1960 and 1980 and that a significant share of the stock is over 40 years old, with structural maintenance, energy efficiency and accessibility to deal with. That is where the typical projects come from:
- Full renovation and star upgrades of hotels: rooms, building services, common areas, fire safety — see hotel construction and renovation and aparthotels.
- Refurbishing entire apartment buildings: structure, façades, roofs, lifts and step-free access — building refurbishment.
- Changing the use of a building or ground-floor unit, which in Benidorm needs its own permit — change of use.
- New villas and detached houses — new-build villas.
- Restaurants, bars and shops at street level — commercial fit-out.
Industry is a small part of the local economy: the Urban Agenda puts it at 2.6% of productive activity, and the town's first industrial estate (Plan Parcial 3/1) is still being developed. If you are still looking for a property, we can assess it before you sign: building search.
Permits and planning rules in Benidorm
Information as of 16 November 2026, taken from the texts the town hall (Ayuntamiento) publishes. Before you file anything, check on its e-office that the same version is still in force.
Zoning plan. Benidorm is governed by its 1990 municipal zoning plan (Plan General Municipal de Ordenación, PGMO), finally approved in November 1990. It has been amended 22 times and interpreted 9 times; the consolidated text of its planning rules was approved by the full council on 31 January 2022.
Hotels: the hotel incentive. Amendment No. 1 to the PGMO (second update, published in the provincial gazette, BOP, on 5 September 2017) lets four- and five-star hotels exceed the floor area normally allowed in their zone to enlarge rooms, with compensatory measures — but only after an interior reform plan (Plan de Reforma Interior, PRI) has been approved. The plan comes first, the building permit second. On 4 March 2026 the council was processing a third update (amendment No. 25) aimed at moving four-star hotels up to five stars; it had not been approved at that date.
Which authorisation each job needs, under the town's bylaw on planning and activity authorisations:
- Self-declaration (declaración responsable): renovation with no extension and no new building — even if it touches the structure or façade — on urban land and with no listed elements. Once the complete file is registered, work may start.
- Major works permit (licencia de obra mayor): new buildings, extensions and demolition, with a design at least at basic-project stage, endorsed by the professional body. The town hall has two months to decide.
- Change-of-use permit (licencia de cambio de uso): two months. Any work on a protected or listed building needs a permit, whatever its size.
- Everything is filed on the e-office (sede.benidorm.org) under Urbanismo; the compatibility report for holiday lets is under Aperturas.
Tax and fee. The construction tax (ICIO, Impuesto sobre Construcciones, Instalaciones y Obras) is 4% of the construction cost (Tax Bylaw No. 5, consolidated text published in the BOP on 20/05/2021). The permit fee (Tax Bylaw No. 11, BOP 04/04/2017) is 2.32% of the budget for new buildings and extensions and 4.38% for a detached house; a self-declaration over €6,000 pays 2.32%.
Building in a town that never closes: hours, season and protection
Working hours. Noise Bylaw No. 3 (BOP No. 77, 16/04/2007) bans building work between 22:00 and 08:00 on working days and on public holidays, limits equipment to 90 dB(A) measured at five metres, and asks for the noisiest work to be done between 10:00 and 20:00, with regard for nearby homes, hotels and hospitals. Loading and unloading materials is prohibited between 22:00 and 08:00.
The season. The bylaw sets no special summer regime for private works. In practice the business sets the calendar: with hotels open all year, a renovation is phased floor by floor or fitted into each hotel's closure, with the noisy work kept to the 10:00–20:00 window. Since the 2024 change to the mobility bylaw (BOP 06/11/2024), anyone putting up a new building must show space on site for loading and unloading; where that is impossible, a works parking reservation can be requested.
Protected heritage. The Morales (Escaletes) and Punta del Cavall watchtowers and the Tossal de la Cala archaeological site are Assets of Cultural Interest (BIC), and several churches, including Sant Jaume, are listed locally (BRL). The council's catalogue of protected assets is being drafted (preliminary consultation in 2025), and the bylaw requires a permit for any work on listed elements or elements being listed — worth checking before designing anything in the old town.
Holiday lets. Under the regional Decree-Law 9/2024, a tourist rental needs a favourable municipal planning compatibility report, and in July 2026 the town hall announced its first fines for unauthorised holiday flats. If you are buying a building to run as holiday lets, that report is the first thing to request.
What we build and renovate in Benidorm
Hotels
New build, extension and full refurbishment of city and holiday hotels.
Building refurbishment
Structure, façade, roof and services of an entire building.
Change of use
From shop or office to home, and from building to hotel or aparthotel.
Aparthotels and hostels
Entire buildings converted into tourist accommodation let by the unit.
What to know before you start
Do you work in Benidorm if your office is in Alicante?
Yes. Benidorm and the Marina Baixa are one of the two areas where we work regularly. The office is in Alicante and the team travels to the site for visits and to run the works.
Does a hotel renovation in Benidorm need a permit?
It depends on the scope. A renovation with no extension or new build, on urban land and with no listed elements, goes through a self-declaration; an extension is major works; and to exceed the zone's floor area under the hotel incentive, an interior reform plan must be approved first. This is general information, not legal advice.
How much is the construction tax (ICIO) in Benidorm?
4% of the construction cost, under Tax Bylaw No. 5 as published by the town hall (consolidated text, BOP 20/05/2021), plus the permit fee of Tax Bylaw No. 11. Information as of 16/11/2026.
Can building work go on in summer?
The noise bylaw does not ban private works in summer: no work between 22:00 and 08:00 or on public holidays, and the noisiest jobs between 10:00 and 20:00. In an open hotel the works are also phased by floor so guests can stay.
Can you assess a Benidorm building before I buy it?
Yes, and that is the best moment. With the address or the cadastral reference (referencia catastral) we check what the zoning plan allows, whether it is protected, which permit the works will need and a first investment figure.
Sources
- Agenda Urbana de Benidorm (Ayuntamiento de Benidorm, 2025): planta hotelera 2024, antigüedad del parque, actividad industrial
- Turisme Comunitat Valenciana: ocupación hotelera por zonas turísticas (EOH del INE), julio de 2025
- Turisme Comunitat Valenciana: ocupación hotelera por zonas turísticas (EOH del INE), diciembre de 2025
- Documento Inicial Estratégico de la Modificación Puntual nº 25 del PGMO (3ª actualización de la incentivación hotelera), 04.03.2026
- Texto Refundido de las Normas Urbanísticas del PGMO 1990 de Benidorm, enero de 2022
- Ordenanza de autorizaciones urbanísticas y de actividades del Ayuntamiento de Benidorm
- Sede electrónica del Ayuntamiento de Benidorm: portal de trámites (Urbanismo, Aperturas)
- Ordenanza Fiscal nº 5, reguladora del Impuesto sobre Construcciones, Instalaciones y Obras (texto refundido, BOP 20/05/2021)
- Ordenanza Fiscal nº 11, reguladora de la tasa por otorgamiento de licencias urbanísticas (BOP 04/04/2017)
- Ordenanza Municipal nº 3 de Protección contra la Contaminación Acústica y Vibraciones (BOP nº 77, 16/04/2007)
- BOP de Alicante nº 213, 06/11/2024: modificación de la Ordenanza de Movilidad nº 1 de Benidorm
- Catálogo de Bienes y Espacios Protegidos de Benidorm: documento de consulta pública previa, 18/02/2025
- Decreto Ley 9/2024, de 2 de agosto, del Consell, sobre viviendas de uso turístico (DOGV nº 9910, 07/08/2024)
- Ayuntamiento de Benidorm: primeras sanciones por viviendas turísticas no autorizadas, 15/07/2026
Where we work
We work across the province of Alicante: Alicante and its surroundings, Benidorm and the Marina Baixa, and the rest of the province. Our office is in Alicante and we travel to the site.
Tell us about your project by phone
In one call we tell you whether we can take on your project, what is needed to start and what the next steps are. Complete projects only: we do not do partial renovations or one-off jobs.