+34 602 510 710

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

info@teciforp.es
Altea · Marina Baixa

Builders in Altea: old town and villas

Teciforp fully renovates houses in Altea's old town, refurbishes buildings and builds villas on the hillside urbanisations. We work from our only office, in Alicante, and travel to the site: survey, design, authorisations and construction with one company responsible throughout.

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

We work in Altea from our office in Alicante (C/ Arquitecto Vidal, 22) and travel to the site.

Steep street of whitewashed houses with blue wooden doors and one façade being restored behind a small scaffold

What gets built and renovated in Altea

Altea had 24,592 residents on 1 January 2025 (INE). The regional government's municipal profile counts 28,788 urban properties at the end of 2025, 15,888 of them residential, and shows a stock of two very different ages: 1,171 properties built before 1950 — far more than in neighbouring towns — and almost 38% built between 2000 and 2009. In 2025, 620 of the 635 home sales were resales.

That is where the typical projects come from:

  • Refurbishing houses in the old town under the historic-ensemble rules — building refurbishment.
  • New villas in the low-density residential zone and on the hillside urbanisations — new-build villas.
  • Full renovation of 1970s to 1990s chalets and apartments — full renovation.
  • Changes of use, which need their own permit and are restricted on the coastal strip — change of use.

The old town: an Asset of Cultural Interest

Information as of 16 November 2026, from texts published by the town hall, the provincial gazette (BOP) and the state gazette (BOE); check them before you design.

Regional Decree 69/2013 listed the historic ensemble of the Renaissance walls and old town of Altea as an Asset of Cultural Interest (BIC). Until there is a Special Protection Plan, any work with heritage significance needs authorisation from the regional culture department (Conselleria de Cultura) before the permit; only interior work that does not change the outside can be declared insignificant, on a municipal technical report. The decree's rules are specific:

  • New buildings and extra storeys: at most 7.30 m for three storeys (ground, first and loft) and 5.40 m for two; no semi-basements.
  • Pitched roofs in curved white clay tiles, at a 30–35% slope.
  • Vertical openings; balconies projecting no more than 35 cm and up to 1.80 m long; no enclosed bay windows.
  • Wooden joinery only, no blinds except traditional roll-up and Majorcan shutters; whitewashed lime render.
  • The historic plot pattern stays, no setbacks or front courtyards, and the whole area is an archaeological watch zone.

Outside the old town the 1982 General Plan («PGOU 82») applies: the new structural plan was provisionally approved in 2023 but is not yet in force. In zone 10, low-density residential, the minimum plot is 600 to 1,000 m² depending on the sub-zone, with 25–30% coverage and, in sub-zones 10C and 10E, two storeys and 7 m.

Permits, construction tax and fees in Altea

Which authorisation each job needs. The planning authorisations bylaw (BOP 05/08/2024) allows a self-declaration (declaración responsable) for simple renovation, work affecting the structure without replacing main structural elements, maintenance — re-roofing, waterproofing, façades, windows —, work of no heritage significance on protected buildings and solar panels on existing buildings. Work can start on the day the declaration is filed and must start within a month. New buildings, extensions, replacing the main structure, demolition, changes of use — two months for a decision — and work of heritage significance need a permit (licencia). Everything goes through the e-office (altea.sedelectronica.es).

Tax and fee. The construction tax (ICIO) is 3.5% (BOP 03/09/2024), self-assessed before the permit. Properties in the catalogue of protected assets get 95% off for full refurbishment, 50% at protection levels A and B and 35% at level C; there is also 95% off for optional solar installations and 90% for accessibility works. The planning permit fee is 2.09% of the budget.

A summer without noisy works, and holiday lets

Altea's site-hours bylaw (BOP 18/08/2016) is among the strictest on the coast. During the year work runs Monday to Friday 08:00–20:00 and Saturday 09:00–14:00, with heavy machinery — breakers, concrete mixers, cranes, excavators — only Monday to Friday 08:00–14:00 and 15:30–17:30. In summer hours shrink to 08:00–16:00, and from 16 July to 31 August noisy work is banned — earthworks, structure, demolition —, while demolition on urban land is not allowed all summer. That time does not count towards the permit's deadline. In the old town there is also no work at Christmas, Easter week or the patron-saint festivities. Interior work without machinery carries on all year.

Since July 2026 complementary bylaw 4-8 on holiday lets applies: an overall cap of 12 per 100 homes and a ban in vulnerable zones — including the traditional historic core — unless the home results from the full refurbishment of a traditional or listed building.

Frequently asked questions

What to know before you start

Do you work in Altea if your office is in Alicante?

Yes. Altea is part of Benidorm and the Marina Baixa, one of the two areas where we work regularly. The office is in Alicante and the team travels to the site.

What do I need to renovate a house in the old town?

If the work changes the outside or has heritage significance, authorisation from the regional culture department and then a municipal permit, following the decree: white curved tiles, wooden joinery, heights of 5.40 or 7.30 m. Interior work can go by self-declaration if the town hall deems it insignificant.

Can building work go on in Altea in August?

Interior work without machinery, yes. Noisy work — earthworks, structure, demolition — is banned from 16 July to 31 August, and the rest of the summer hours are 08:00–16:00.

How much is the construction tax (ICIO) in Altea?

3.5%, under the bylaw published in the BOP on 03/09/2024, with reliefs of up to 95% for listed properties and other works, plus the 2.09% permit fee. Information as of 16/11/2026; not tax advice.

Can you check a house before I buy it?

Yes. We check whether it is in the historic ensemble or the catalogue, its zone in the 1982 plan, which authorisation the works will need and whether holiday letting is possible there, with a first investment figure.

Where we work

We work across the province of Alicante: Alicante and its surroundings, Benidorm and the Marina Baixa, and the rest of the province. Our office is in Alicante and we travel to the site.

Call us

Tell us about your project by phone

In one call we tell you whether we can take on your project, what is needed to start and what the next steps are. Complete projects only: we do not do partial renovations or one-off jobs.

+34 602 510 710

WhatsApp

We speak English, Spanish and Russian

Monday to Friday, 9:00–14:00 and 17:00–19:00

We'll call you

Leave your number and we'll call you

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

Data controller: Teciforp S.L. · Purpose: to call you back about your request · Your rights: info@teciforp.es

CallWhatsAppWe'll call you