+34 602 510 710

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

dmitriy.l@teciforp.es
Change of use

Change of use: from commercial to residential, and from building to accommodation

We handle changes of use (cambio de uso) from commercial to residential in Alicante and on the Costa Blanca, converting shops and offices into homes, and entire buildings into hotels or aparthotels. We work for investors and owners: first we check whether the change is possible, then we take care of the licence and the works through to handover.

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

Complete projects only: we do not do partial renovations or one-off jobs.

Bright living room of a former commercial space turned into a home, with a large wooden window onto the street and pale sofas
What's included

Everything it takes, under a single contract

Planning feasibility

Whether the zoning plan (planeamiento) allows the new use in that specific property.

Habitability conditions

The light, ventilation, ceiling height and floor area a home requires.

Design and licence

A technical design by registered professionals and the application at the town hall.

Complete works

Layout, services, insulation and finishes.

Title deed and registration

Technical documentation so that the new use is recorded in the title deed (escritura) and at the Land Registry (Registro de la Propiedad).

From building to accommodation

Hotels and aparthotels in entire buildings.

From shop or office to home

Former shop converted into a flat with timber beams, polished concrete floor and tall glazed doors

This is one of the jobs with the most paperwork and the least room for error, because the result depends not only on the works but on what the rules allow. That is why we always start it on paper.

A shop or an office can be converted into a home if the zoning plan allows it and if the space can meet the conditions required of a dwelling. The order is always the same:

  1. Planning feasibility: whether the municipal by-laws (ordenanza municipal) allow residential use on that floor and in that street.
  2. Habitability conditions: a façade onto the street or onto a courtyard, natural light, ventilation, clear ceiling height and minimum floor area.
  3. Licence: a technical design by registered professionals and the application at the town hall.
  4. Works: layout, insulation against noise and damp, new services and finishes.
  5. Title deed and registration: with the final documentation of the works, the new use is entered in the title deed and at the Land Registry.

From building to hotel or aparthotel

Pale-fronted building converted into a hotel, with balconies, a glazed entrance and palm-lined pavement

An office or residential building can be converted into tourist accommodation. First of all, we check the use the zoning plan allows and whether the municipality has restricted or suspended new licences for tourist accommodation.

If the change is viable, the rest is a hotel project or an aparthotel project: new layout, accessibility, evacuation, services for each unit and the documentation to register the property as tourist accommodation (alta turística).

Tourism regulations change often and are not the same in every municipality. Before giving you a figure, we check the current situation with the town hall concerned.

What usually decides the outcome

Long empty commercial unit with old patterned floor tiles and one glazed frontage

When commercial premises become a home, what weighs most is not the works but the starting point. Premises with a wide frontage and a good ceiling height make a bright home; deep premises with a single narrow frontage may not make one at all.

The floor level matters too: many by-laws do not allow homes on the ground floor in certain streets, or impose additional conditions. And insulation against the street, against damp from the ground and against noise from the building is the part of the works you notice most afterwards.

In a building that is turned into accommodation, what decides is the staircase, the lift and the evacuation routes. If the circulation core cannot comply, the design changes a great deal or stops being viable.

That is why we do not give a figure without seeing the premises. After the visit and the planning feasibility check, we tell you whether the change is possible, how many homes will fit and what works are needed.

What we check before you buy

Technician in a hard hat and hi-vis vest measuring an empty unit with a tripod laser
  • The use the zoning plan allows on that plot and on that floor.
  • Whether the property can meet the light, ventilation, height and floor area requirements of a home.
  • The condition of the structure and of the building's main services.
  • Accessibility and evacuation, if the new use is accommodation.
  • What the title deed and the land registry note (nota simple) say about the current use.
  • The utility connections: enough water, drainage and electricity for the new use.

With that check, you know whether the change is possible before you sign the purchase. A change of use that is not viable cannot be fixed with building work.

An important note

This text is for information only and is not legal advice. Every change of use depends on the municipality's zoning plan, on the property's status at the Land Registry and, where applicable, on the building's by-laws (estatutos de la comunidad). For the legal and registry side, consult your lawyer or your notary; we provide the technical side and the works.

+190Full renovations
8Years in the sector
80+Professionals
+200Satisfied clients

Works insured for €1,200,000 · 2-year guarantee from handover · Contract and itemised quote

Frequently asked questions

What to know before you start

Can any commercial premises be converted into a home?

No. It depends on the zoning plan allowing residential use on that floor and on the premises being able to meet the habitability conditions: light, ventilation, height and floor area. We check this before you commit.

Can you assess the premises before I buy them?

Yes, and that is the best time to do it. With the address or the cadastral reference (referencia catastral) we review the zoning plan and, with a visit, the conditions of the space.

How long does a change-of-use licence take?

It depends on the town hall, on the complexity of the design and on whether another authorisation is needed first. We will tell you once we know where the property is and what you want to do with it.

Do you take care of the title deed and the registration?

The deed is executed before a notary and the entry is made by the Land Registry. We give you the technical documentation of the works that they will ask for.

Can I convert an office into tourist accommodation?

It depends on the zoning plan and on whether the municipality has restricted new licences for tourist accommodation. We check this in the feasibility study, before designing.

Do you carry out the works yourselves?

Yes. Design, licence and complete works under a single contract, through to the handover of the finished home or building.

Call us

Tell us about your project by phone

In one call we tell you whether we can take on your project, what is needed to start and what the next steps are. Complete projects only: we do not do partial renovations or one-off jobs.

+34 602 510 710

WhatsApp

We speak English, Spanish and Russian

Monday to Friday, 9:00–14:00 and 17:00–19:00

We'll call you

Leave your number and we'll call you

We speak English, Spanish and Russian · Monday to Friday, 9:00–14:00 and 17:00–19:00

Data controller: Teciforp S.L. · Purpose: to call you back about your request · Your rights: dmitriy.l@teciforp.es

CallWhatsAppWe'll call you